Fact-checked against 4 official sources on November 21, 2026How we check
Short answer

A heat pump quote that can qualify for Ontario's Home Renovation Savings rebate should name the exact equipment under one AHRI number, confirm the model is an active cold climate unit on the NRCan list, and say that the contractor is on the program's participating list and will file the pre-installation application. It should also include the NRCan sizing form, your backup heat plan, the warranty and any electrical work. If a quote leaves out the AHRI number or the filing step, ask for them in writing before you sign.1

See what your home gets, in about a minute.

Check my rebate

The equipment: model, AHRI number and cold climate status

The quote should list the outdoor unit and every indoor component by model number. For a central (ducted) system, the program wants the system listed under a single AHRI number. For a ductless or partially ducted mini-split, all components also sit under one AHRI number.1

Ask for that AHRI number on paper. It lets you, or us, look the system up.

The model must also be an active cold climate air source heat pump on the Natural Resources Canada (NRCan) eligible product list. A standard air source heat pump does not qualify for the rebate.2 The program sets minimums as well: a seasonal heating rating (HSPF2) of 6.6 for Region V, a rated heating capacity of at least 12,000 BTU/h at 8.3 C, a COP of at least 1.8 at -15 C, and at least 70% of rated capacity kept at -15 C. The unit also needs variable capacity.1

The sizing form

The contractor must submit an NRCan Air-source Heat Pump Sizing and Selection Tool form for each outdoor unit. Ask to see a copy.1

The form records which of four sizing options the contractor chose. Options A to D run from a unit sized mostly for cooling, to one big enough to carry all or nearly all of the heating over the full season. Homes heated by oil, wood or electricity can only use options C and D, which means the heat pump has to carry most or all of the heating. Homes heated by gas or propane can use any of A to D.1

The system must be able to heat the whole home, basement included.1 A quote for a single small unit that covers only the main floor of an older house is a reason to ask questions.

Contractor status and who files

You must use a contractor on the Participating HVAC Contractor List. The program says the contractor must be registered and listed before you proceed with the installation.2 To be listed, a contractor needs:

  • a valid Ontario business licence
  • at least two consecutive years of heat pump business in Ontario
  • at least one year of preventative maintenance and warranty service
  • insurance from a reputable insurer
  • a 313D or 313A Air Conditioning Systems Mechanic licence
  • TSSA registration and an Ozone Depletion Prevention certificate1

The quote should state the contractor's licence details and say plainly that the contractor submits the pre-installation application. That application includes an itemized work order, photos of your existing heating system and nameplates, your signed participant agreement and the sizing form.1

Pre-approval is mandatory. Installations done before approval are not eligible for rebates, so the quote should say the work starts only after written approval.2

Backup heat and the tank step

Ask what heats the house on the coldest days. The program allows existing or new backup heat, and it does not pay for that backup.1

Your home heats withBackup the program allows
OilElectric resistance heat where backup is necessary; you move to an electric heat pump
PropaneA propane furnace can stay as backup in a hybrid system
Wood or electricYour existing wood or electric resistance heat can stay as backup
Enbridge natural gasA new or existing gas furnace or boiler

Source 1

For oil or propane, the quote should include the tank step. The owner signs an Oil/Propane Tank Removal Attestation Form, and the tank is maintained, emptied or removed under Ontario rules by a TSSA-registered contractor.3 If a quote for an oil home does not mention the tank, ask why.

Warranty and electrical work

Look for the equipment warranty and the installer's labour warranty as separate lines, with the length of each. Program contractors must have at least one year of maintenance and warranty service behind them, but the terms of your warranty are between you and the contractor.1

Electrical work should be itemized. We found no official Ontario page that sets a panel size or permit rule for heat pumps, so we won't quote one. Ask the contractor to check your electrical service and put what they find, and what it costs, in the quote.1

The rebate timeline

A good quote lays out the order of events. You get a contractor list, the contractor files the pre-installation application, and you wait for written approval before work begins.2 Within 30 days after installation the contractor files the post-installation application.1 After approval, the program's help page says a cheque arrives by mail within 60 days, and an Interac e-Transfer arrives faster, within 30 days.4

You pay the contractor for the equipment and installation. The rebate comes back to you afterward.1 Check the quote for the full price and payment schedule, since the rebate does not reduce the invoice.

The program pays $1,250 per ton up to $7,500 for homes heated by electricity, oil, propane or wood, and $500 per ton up to $2,000 for Enbridge gas homes and rentals. The amount is based on rated heating capacity at 8.3 C.2 We can't promise a figure for your house. See the rebate checker for what applies to your fuel.

A printable version of this list is in our free guides. If the quote involves oil, read switching from oil to a heat pump too, and the sizing article explains the form in more detail.

See what your home qualifies for

Seven questions, about a minute, with the rules for your fuel.

Check my rebate

Common questions

What is an AHRI number on a heat pump quote?

It is the reference number for the matched set of outdoor and indoor equipment. The Ontario program requires the system to be listed under one AHRI number, so ask for it on the quote.1

Who applies for the heat pump rebate, me or the contractor?

The contractor submits the pre-installation and post-installation applications. You sign the participant agreement, and the rebate is paid to you after the installation is approved.2,1

Can I sign the quote before the rebate is approved?

You can sign a quote, but installation must wait for the program's written approval. Installations done before approval are not eligible for rebates.2

Does the quote need a home energy assessment?

No. The heat pump rebate does not require an energy assessment.2